Investment Balance
Investment Balance breaks allocation down by issue type, issue label, or epic. It does not use the allocation categories from Resource Allocation. Each tab ranks the values that already exist on your issues.
Open it from Planning → Investment Balance.
The page has three tabs:
- Issue Types — Groups allocation by issue type, such as Bug, Task, Story, Incident, Epic, or Sub-task.
- Issue labels — Groups allocation by the labels on issues.
- Epics — Groups allocation by epic.
Changing tabs keeps the current filters and leaves any open drill-down.
Filters
The filters at the top apply to the chart, the table, and every drill-down.
- Period — The date range. Buckets follow the granularity chosen in Settings.
- Issues — Limit the report to selected issue collections.
- Attributes — Limit the report to selected attributes.
- Teams — Limit the report to selected teams.
- View — Switch the unit between % and FTE. In percent view the table column is Allocation %. In FTE view it is Allocation FTE.
- Settings — Set the granularity (day, week, or month, depending on the selected period).
Allocation chart
Each tab shows a stacked bar chart titled for the active grouping:
- Allocation by Issue Types
- Allocation by Issue labels
- Allocation by Epics
Each series is one type, label, or epic. Labels appear on a segment when they fit. The tooltip lists every series for that period with its share.
Use the chart-type control in the top-right of the chart to switch between Stacked Bar (the default), Bar, and Line.
Allocation table
The table under the chart is titled the same way as the chart, for example Allocation by Issue Types. Its description reads: “Allocation and cost grouped by Issue Types” (or Issue labels, or Epics).
| Column | What it shows |
|---|---|
| Type | The issue type, label, or epic name, with a rank badge such as Rank #1. |
| Trend | A sparkline of that row across the selected periods. |
| Issues | Number of issues in the group. |
| Story Points | Total story points in the group. |
| Allocation % or Allocation FTE | Share or effort, shown as a bar and a value. The header follows the View filter. |
| Est. Cost | Estimated cost for the group. |
| Last Activity | Date of the most recent activity. |
| Contributors | Avatars of the people who contributed. |
Rows are ranked by allocation. Click anywhere on a row to open the collections inside that type, label, or epic.
Collection drill-down
Opening a row replaces the tab chart and table with the collections for that value. A stacked chart titled Allocation by {name} shows how effort inside that type, label, or epic is split across its collections. The same chart-type options apply: Stacked Bar, Bar, and Line.
The breadcrumb shows the path, for example Issue Types > Bug. Select the first crumb to return to the tab.
The collection table has:
| Column | What it shows |
|---|---|
| Name | The collection name. |
| FTE | Effort for that collection, shown as a value and a bar. |
| Est. Cost | Estimated cost for the collection. |
| Issues | Number of issues in the collection. |
| Story Points | Total story points in the collection. |
| Contributors | Avatars of the people who contributed. |
| Last Activity | Date of the most recent activity. |
Click a collection to open its issues. The breadcrumb extends, for example Issue Types > Bug > Development.
Issue drill-down
The issue table lists the issues in the selected collection. This step has no allocation chart.
| Column | What it shows |
|---|---|
| Title | Issue title. The external-link icon opens the issue in the source provider. |
| Issue Type | The issue’s type. |
| State | Current state, such as in progress, code review, or in testing. |
| Effort | Effort recorded on the issue. |
| Story Points | Story points assigned to the issue. |
| Assignee | The person assigned to the issue. |
| Updated | Date the issue was last updated. |
Updated about 2 hours ago
